Water infiltration issues during tunnel excavation?

What if you switched to the CONDAT emergency sealants!
During TBM operations, controlling water ingress is critical to ensure safe working conditions and secure maintenance interventions.
CONDAT offers two complementary solutions depending on operating conditions:
- In static conditions (TBM stopped), such as brush replacement operations or other maintenance interventions, ๐๐๐๐๐๐ ๐๐๐๐๐ is injected in between the shield brushes to create an effective sealing barrier and ensure safe intervention conditions.
- In dynamic conditions (TBM advancing), in case of leakage,ย WRS emergency sealant can be injected using the standard tail sealant system (same pumps, lines and injection points). Reacting with water, WRS quickly blocks water, grout and soil fines ingress while allowing excavation to continue.
And in some exceptional situations, both solutions can even be used together. This is exactly what happened on a TBM Slurry project in the UK,ย facing a ๐ฐ๐๐ญ๐๐ซ ๐ฉ๐ซ๐๐ฌ๐ฌ๐ฎ๐ซ๐ ๐จ๐ ๐.๐ ๐๐๐ซ๐ฌ during a cutterhead intervention.
The combination of WRS + CONDAT BLOCK enabled the customer to:
- stop water circulation along the shield
- secure the intervention under atmospheric pressure
- prevent any water ingress during the operation
A real-life case demonstrating the full potential of the WRS + CONDAT BLOCK combination for critical tunnelling operations.
Want to avoid unexpected water ingress issues and costly TBM downtime?
Our teams are ready to help you secure your operations with the right sealing solution for your site conditions.